Streetlight Pole & Footing Replacement

About the Customer
An Australian customer required the replacement of existing lighting poles, luminaires and footings. The scope included new pile foundations, reinforcement and anchor bolts, lighting and electrical equipment installation, testing, commissioning, asset labelling and surface reinstatement to local authority requirements.
Situation
The client had coordinates, luminaire details and site photographs of an existing pole.
Task
  • Locate the pole and surrounding utilities
  • Remove the existing pole and replace it with a new pole and luminaire
  • Ensure compliance with client requirements and standards
  • Deliver a model optimised for the proposed pole
Action/Approach
  • Analysed the survey and instructions to extract equipment dimensions
  • Validated equipment type, location and layout using site images
  • Modelled site components: pole and utilities
  • Created the Issue for Approval drawings
  • Ensured correct placement, elevation and alignment
  • Performed visual QA/QC and IFC readiness checks
Result
  • Established a CD and DWG package for the area
  • Located the pole
  • Located nearby utilities
Tools / Software
  • Autodesk AutoCAD
  • Adobe PDF
For Information, please visit – Electric and Gas Utilities

SUCCESS STORIES

  • Telecommunication
  • Electric and Gas Utility
  • Mapping and Navigation
  • AEC Industry
  • GIS Software Automation
  • Land Information Management